← US EVA-101
US EVA-101
Archive: Anil Menon prepares the station for later power-system upgrades during a spacewalk on August 6, 2026. This is not the forthcoming November 5 spacewalk. · NASA

US EVA-101

Published target: Nov 5, 2026, 12:00 PM UTC · EVA

RSS feed ↗

Stages & history

1 linked record
  1. US EVA-101

    Event record

Event dates are published targets. Confirmed milestones appear below when reported.

The source has not linked another mission stage.

Mission details

  • planned

    Mission description

    US EVA-101 is planned to complete the International Space Station’s roll-out solar-array upgrade. NASA astronaut Anil Menon and CSA astronaut Joshua Kutryk are assigned to install and deploy the eighth array on the 3B power channel. The arrays supplement the station’s ageing original solar wings; NASA projects up to 30% more available power, from 160 to approximately 215 kilowatts. The upgrade supports research and critical station operations, including the eventual safe, controlled deorbit. Preparations include suit communications and medical checks, tool and tether inspections, and rehearsing array retrieval and installation.

    Evidence

    Proposed English description in the existing mission model. Historical preparation and future objectives are distinguished; operational fields are unchanged.

    Verified 2026-10-27

Reporting

Sources and record details