← Griffin Mission One
Griffin Mission One
Griffin-1 entering JPL’s thermal-vacuum chamber on 31 August 2026. The yellow-striped box is a FLIP payload simulator. · NASA/JPL-Caltech

Griffin Mission One

January 2027 · date to be confirmed · To Be Determined

RSS feed ↗

Mission stages

1 linked record
  1. Griffin Mission One

    To Be Determined

The source has not linked another mission stage.

Assigned hardware

booster

Unknown FH

3 linked mission records

booster

Unknown FH

3 linked mission records

booster

Unknown FH

3 linked mission records

Mission details

  • planned

    Mission description

    Griffin Mission One is a Voyager Lunar Systems lunar lander assigned to launch on Falcon Heavy toward Nobile Crater near the Moon’s south pole. NASA reported completion of its JPL environmental-test campaign in late September 2026, followed by a return to Pittsburgh for final assembly. The mission plans to deliver the FLIP rover and other payloads; NASA and Voyager described a late-2026 target on 13 October; a firm launch date remains unconfirmed.

    Evidence

    Existing mission model description; completed ground work is explicitly attributed and separated from the future flight.

    Verified 2026-11-01

Reporting

Sources and record details