FROM THE SOURCES

Space news

Latest reporting, credited to its original publishers.

NASASpaceflight

RFA reveals second stage and updates test path to 2023 launch

Read original report ↗
Read summary

Rocket Factory Augsburg (RFA) has revealed the second stage for its upcoming RFA One rocket. The company’s tweet showed a second stage, integrated with a Helix engine. This engine will power both the first and second stages. NASASpaceflight spoke to RFA about the reveal and RFA’s test campaign for the second stage pathfinder.

Summary supplied by NASASpaceflight.

NASA

ISS Daily Summary Report – 11/08/2022

Read original report ↗
Read summary

Cygnus NG-18 Status: Yesterday, solar array wing #2 on NG-18 did not deploy. Troubleshooting attempts to deploy the array have been unsuccessful; however, teams have determined the configuration is acceptable for loads and concurred to proceed towards nominal rendezvous with the ISS tomorrow morning at 4:05 AM CT. Ground teams are assessing potential updates to …

Summary supplied by NASA.

NASA

Read summary

NASA will provide coverage of the upcoming prelaunch and launch activities for the National Oceanic and Atmospheric Administration’s (NOAA’s) Joint Polar Satellite System-2 (JPSS-2) mission and NASA’s Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) technology demonstration.

Summary supplied by NASA.

Spaceflight Now

Cygnus cargo ship launches to space station, deploys one of two solar arrays

Read original report ↗
Read summary

Using its second-to-last Antares rocket with Russian engines before a redesign to rely on all-U.S. propulsion, Northrop Grumman sent a Cygnus supply ship into orbit from Virginia on Monday to deliver spacewalk equipment, experiments, and fresh treats for the crew on the International Space Station. Ground teams only confirmed one of the two solar arrays deployed after launch, but engineers believe the spacecraft has enough power to reach the station and complete its primary mission.

Summary supplied by Spaceflight Now.

NASA

ISS Daily Summary Report – 11/07/2022

Read original report ↗
Read summary

Cygnus NG-18 Launch: At 4:32 AM CT today, Cygnus NG-18 launched from the Wallops Flight Facility on an Antares 230+ rocket. NG-18 is scheduled to be captured by the Space Station Remote Manipulator System (SSRMS) at 4:05 AM CT on Wednesday, November 9th. NG-18 is transporting important science experiments, equipment, and crew provisions to the …

Summary supplied by NASA.

NASA

Read summary

NASA Administrator Bill Nelson named Dr. Jimmy Kenyon director of the agency’s Glenn Research Center in Cleveland, effective immediately.

Summary supplied by NASA.

SpaceNews

Cygnus solar array fails to deploy

Read original report ↗
Read summary

NASA is weighing whether it is safe for a Northrop Grumman Cygnus cargo spacecraft to approach the International Space Station because one of two solar array failed to deploy hours after launch Nov. 7.

Summary supplied by SpaceNews.

Spaceflight Now

First Starliner crew flight slips to April 2023

Read original report ↗
Read summary

The first test flight of Boeing’s Starliner crew capsule with astronauts has been delayed from February to April 2023, moving the mission after a busy stretch of crew and cargo missions to the International Space Station, and allowing more time for engineers to address problems discovered on an unpiloted test flight earlier this year, NASA said last week.

Summary supplied by Spaceflight Now.

SpaceNews

Psyche review finds institutional problems at JPL

Read original report ↗
Read summary

An independent review of problems that delayed the launch of NASA’s Psyche asteroid mission uncovered institutional issues at the Jet Propulsion Laboratory that led the agency to delay the launch of another mission being developed there.

Summary supplied by SpaceNews.

Spaceflight Now

Northrop Grumman ready for space station resupply mission

Read original report ↗
Read summary

Northrop Grumman is set to launch the penultimate flight of its current Antares rocket configuration — with Russian engines and a Ukrainian first stage structure — to begin a resupply mission Sunday delivering more than four tons of cargo to the International Space Station.

Summary supplied by Spaceflight Now.

NASA

Read summary

NASA and the U.S. Agency for International Development (USAID) signed an agreement Friday strengthening the collaboration between the two agencies, including efforts that advance the federal response to climate change.

Summary supplied by NASA.

NASA

ISS Daily Summary Report – 11/04/2022

Read original report ↗
Read summary

Payloads: ECHO: The Echo hardware was retrieved and deployed in the Columbus Module, and the ground performed maintenance activities. The purpose of the ECHO investigation is to evaluate a tele-operated ultrasound system, equipped with motorized probes that are controlled by flight controllers on the ground. Additionally, this investigation serves to perform the commissioning of the …

Summary supplied by NASA.

NASA

Read summary

NASA and the agency’s Jet Propulsion Laboratory (JPL) in Southern California, which leads Psyche, shared a response Friday to the results of an independent review board convened to determine why the mission to study a metal-rich asteroid of the same name missed its planned 2022 launch opportunity.

Summary supplied by NASA.

NASA

Read summary

NASA will participate in the 27th United Nations Climate Change Conference of the Parties (COP27) in Sharm El Sheikh, Egypt, which begins Sunday, Nov. 6, and runs through Friday, Nov. 18. The COP27 summit brings together countries from around the world to increase ambition by implementing existing goals and strengthening commitments to solutions th

Summary supplied by NASA.

NASA

Read summary

NASA is targeting Monday, Nov. 14, for the launch of the Artemis I Moon mission during a 69-minute launch window that opens at 12:07 a.m. EST.

Summary supplied by NASA.

NASASpaceflight

SLS returns to LC-39B for next Artemis I launch opportunity

Read original report ↗
Read summary

The first Space Launch System (SLS) rocket made the 6.7 km trip from High Bay 3 in the Vehicle Assembly Building (VAB) back out to Launch Complex 39B Thursday night into Friday morning. The move follows a five-week stay in the VAB to shelter from Hurricane Ian and allow teams to prepare the vehicle for its next launch attempt.

Summary supplied by NASASpaceflight.