FROM THE SOURCES

Space news

Latest reporting, credited to its original publishers.

NASASpaceflight

Boeing expanding SLS Core Stage production to KSC to build Artemis inventory

Read original report ↗
Read summary

Boeing, the prime contractor for NASA’s Space Launch System (SLS) Core Stage, is adding two new work locations at the agency’s Kennedy Space Center (KSC) in Florida as the company looks to support increases in the production rate of the launch vehicle. The completed engine section structure for the third Core Stage is being transported by barge from NASA’s Michoud Assembly Facility (MAF) in New Orleans to KSC, where Boeing will now outfit the most complicated element of the SLS inside the Space Station Processing Facility (SSPF).

Summary supplied by NASASpaceflight.

Spaceflight Now

NASA’s Lunar Flashlight hitching ride to moon on SpaceX rocket

Read original report ↗
Read summary

NASA’s Lunar Flashlight spacecraft, a small briefcase-size CubeSat that could break new ground in the search for water ice on the moon, is hitching a ride to space on a SpaceX Falcon 9 rocket along with the privately-developed Hakuto-R moon lander after missing a launch opportunity on NASA’s Artemis 1 mission.

Summary supplied by Spaceflight Now.

Spaceflight Now

Orion moonship closes in for Sunday re-entry and splashdown

Read original report ↗
Read summary

Closing out a 25-day voyage around the moon, NASA’s Artemis 1 spacecraft closed in on Earth Saturday, on track for a 25,000-mph re-entry Sunday that will subject the unpiloted capsule to a hellish 5,000-degree inferno before splashdown off Baja California.

Summary supplied by Spaceflight Now.

Spaceflight Now

Repairs and upgrades await SLS mobile launcher before crewed lunar mission

Read original report ↗
Read summary

The mobile launch platform for NASA’s Space Launch System moon rocket rolled back into the Vehicle Assembly Building at Kennedy Space Center Friday for inspections and repairs after liftoff of the Artemis 1 moon mission last month, setting the stage for upgrades to the 380-foot-tall structure before the first crewed Artemis moon flight scheduled for 2024.

Summary supplied by Spaceflight Now.

NASA

Read summary

NASA has finalized its contract with Boeing of Huntsville, Alabama, for approximately $3.2 billion to continue manufacturing core and upper stages for future Space Launch System (SLS) rockets for Artemis missions to the Moon and beyond.

Summary supplied by NASA.

NASA

ISS Daily Summary Report – 12/09/2022

Read original report ↗
Read summary

Payloads: JEM Small Satellite Orbital Deployer-23 (J-SSOD-23): The J-SSOD-23 experiment hardware was removed from the JEM Airlock slide table and stowed. The four J-SSOD-23 satellites were successfully deployed in early December. J-SSOD provides a novel and safe small satellite launching capability to the ISS. The J-SSOD is a unique satellite launcher, handled by the JEM …

Summary supplied by NASA.

NASA

Read summary

Students in Charlevoix, Michigan, will have an opportunity next week to hear from a NASA astronaut living and working aboard the International Space Station.

Summary supplied by NASA.

NASA

Read summary

NASA has selected Chenega Global Protection, LLC. of Chantilly, Virginia, to receive the NASA Protective Services – Eastern Region contract. The

Summary supplied by NASA.

NASA

Read summary

NASA has awarded a task order to Collins Aerospace to deliver a spacewalking system for potential use outside the International Space Station.

Summary supplied by NASA.

NASA

ISS Daily Summary Report – 12/08/2022

Read original report ↗
Read summary

Payloads: Food Physiology: A diet briefing was attended between the crew and principal investigator team in support of the Food Physiology investigation. The Integrated Impact of Diet on Human Immune Response, the Gut Microbiota, and Nutritional Status During Adaptation to Spaceflight (Food Physiology) experiment is designed to characterize the key effects of an enhanced spaceflight …

Summary supplied by NASA.

NASASpaceflight

SpaceX launches first of three missions for OneWeb

Read original report ↗
Read summary

SpaceX conducted its 55th flight of the year to take the OneWeb Flight #15 mission using a flight-proven Falcon 9 to a polar low Earth orbit (LEO) from Launch Complex 39A (LC-39A) at the Kennedy Space Center (KSC) in Florida. Liftoff occurred on Dec. 8 at 5:27:48 PM EST (22:27:48 UTC).

Summary supplied by NASASpaceflight.

SpaceNews

Virgin Orbit delays first U.K. launch

Read original report ↗
Read summary

Just days after setting a launch date for its first launch from the United Kingdom, Virgin Orbit announced Dec. 8 it was delaying that mission for weeks because of technical and regulatory issues.

Summary supplied by SpaceNews.

CNBC

Investing in Space: Temper your expectations

Read original report ↗
Read summary

As we head into the final weeks of the year, I’ve been thinking about space business lessons to be learned from 2022. One that repeatedly comes up is the need for tempered expectations when it comes to schedule targets across the industry. I spoke to a dozen insiders this week, from investors to executives, about why delays matter. My takeaway: Unrealistic timelines can have a ripple effect, from eating up cash to damaging a firm’s reputation — notching up the stakes.

Summary supplied by CNBC.

Spaceflight Now

SpaceX delivers for rival OneWeb with sunset launch from Kennedy Space Center

Read original report ↗
Read summary

Forty more OneWeb internet satellites rocketed into orbit from Kennedy Space Center at sunset Thursday, company’s first launch with SpaceX after suspending flights on Russian rockets following the invasion of Ukraine. A senior OneWeb official said the company has booked an extra launch with SpaceX, adding to a contract signed earlier this year.

Summary supplied by Spaceflight Now.

NASA

Read summary

NASA has selected A-P-T Research, Inc. of Huntsville, Alabama, to provide safety and mission assurance support services at the agency’s Kennedy Space Center in Florida.

Summary supplied by NASA.

NASA

Read summary

NASA has awarded a contract to Air Products and Chemicals, Inc. of Allentown, Pennsylvania, to supply up to 7.5 million pounds of liquid hydrogen to support operations at the agency’s Kennedy Space Center in Florida and the nearby Cape Canaveral Space Force Station.

Summary supplied by NASA.

NASA

ISS Daily Summary Report – 12/07/2022

Read original report ↗
Read summary

Payloads: Behavioral Core Measures (BCM): A BCM research session consisting of a set of 12 runs/tests was performed. The Standardized Behavioral Measures for Detecting Behavioral Health Risks during Exploration Missions (BCM) experiment initially examined a suite of measurements to reliably assess the risk of adverse cognitive or behavioral conditions and psychiatric disorders during long-duration spaceflight, …

Summary supplied by NASA.

NASA

Read summary

NASA will provide coverage of the upcoming prelaunch and launch activities for the international Surface Water and Ocean Topography (SWOT) mission.

Summary supplied by NASA.