
Stages & history
1 linked recordTDS-01
To Be Determined
The source has not linked another mission stage.
Mission details
- planned
Mission description
TDS-01 is ISRO’s technology-demonstration satellite for electric propulsion, an Indian-built travelling-wave-tube amplifier and quantum key distribution. Its 300 mN stationary plasma thruster uses xenon and is intended to raise the spacecraft toward geostationary orbit. ISRO completed a 1,000-hour ground life test in March 2025 at 5.4 kW, monitoring liner erosion to help estimate operating life. The flight is intended to validate technologies for later navigation and communications satellites; these are demonstration objectives, not reported in-orbit results.
Evidence
Reviewed English mission description for the existing mission model; planned activities and dated ground observations are distinguished.
Verified 2026-10-26 - confirmed
Electric-thruster propellant
Xenon
Evidence
Propellant identified for the 300 mN electric propulsion system intended for TDS-01; not launch-vehicle fuel.
Verified 2026-10-26 - observed
Completed thruster ground life test
1,000 h
Evidence
ISRO-reported test completed March 27, 2025; this is ground-test duration, not time in space or mission life.
Verified 2026-10-26
Reporting
Sources and record details
- Launch Library source record ↗
- Canonical mission and linked hardware record ↗Checked 2026-10-26
- ISRO completes a 1,000-hour plasma-thruster life test ↗Checked 2026-10-26
- Department of Space mission objectives submitted to Parliament ↗Checked 2026-10-26
- Liner-material handover for TDS-01 plasma thruster ↗Checked 2026-10-26
- LPSC technical specification: Hall-effect and stationary plasma thrusters ↗Checked 2026-10-26
- Hall-effect thruster operation and channel erosion ↗Checked 2026-10-26
- In-space propulsion: electric-thruster operating tradeoffs ↗Checked 2026-10-26
