Launch failure.
Update ↗
EOS-N1 and others
PSLV-DL
Historical mission record
This page records PSLV-DL | EOS-N1 and others and its reported outcome: Launch Failure. The date above is a historical record.
Source record updated . This is a source update, not a confirmed launch time.
Check the source: Official Press Kit ↗ · Launch Library ↗
What changed?
Status reported by the mission data provider.
Mission
Small Earth observation satellite from NewSpace India Limited (NSIL) for an "Indian strategic user", details TBD. This launch will also carry 18 other ride-share payloads.
- Launch vehicle
- PSLV-DL
- Mission type
- Earth Science
- Destination orbit
- Sun-Synchronous Orbit
- Launch pad
- Satish Dhawan Space Centre First Launch Pad
- Provider
- Indian Space Research Organization
The vehicle
Published configuration and flight history.

PSLV-DL
PSLV-DL variant has only two strapons boosters with 12 tonne propellant load on them. PSLV-C44 on 24 January 2019 was the first flight to use PSLV-DL variant of Polar Satellite Launch Vehicle.
- Height
- 44 m
- Diameter
- 2.8 m
- Stages
- 4
- Recorded launches
- 5
- First flight
- 2019-01-24
Recorded timing
This is a mission record, not an upcoming calendar appointment.
Target ·
The target marker shows its position within the published window. The schedule may change before launch.
3rd stage lost attitude control towards the end of burn; 4th stage separated and ignited but was unable to regain control.
Flight timeline
Planned sequence, not live telemetry. Times are relative to the launch target.
- T−00:00:03
RCT Ignition
- T+00:00:00
Ignition
- T+00:00:0.42
Booster Ignition
- T+00:01:9.9
Booster Separation
- T+00:01:52.06
Stage 2 Separation
- T+00:01:52.26
SES
Show the full sequence (17 events)
- T+00:02:47.86
Fairing Separation
- T+00:02:52.86
CLG Start
- T+00:04:23.36
Stage 3 Separation
- T+00:04:24.56
Stage 3 Ignition
- T+00:08:14.72
Kick Stage Separation
- T+00:08:25.12
Kick Stage Ignition
- T+00:16:24.62
Kick Stage Cut-off
- T+00:17:54.62
Payload Separation
- T+01:45:59.52
Kick Stage Ignition
- T+01:46:18.14
Kick Stage Cut-off
- T+01:48:5.14
Payload Separation
Launch site & orbit
Satish Dhawan Space Centre, India
Launch site & orbit
Explore the launch pad, then pull back to see the shape of the destination orbit.
Understand this orbit
Coverage & sources
Links supplied by the mission data provider.
Coverage and times may change.
Mission coverage
PSLV-C62 / EOS-N1 Mission | Live Launch Coverage ↗Explore on iPhone
Browse mission details and discover upcoming launches in Spacian.
Open mission in Spacian ↗