Mission coverage

Watch

Mission coverage

US EVA-66

EVA
US EVA-66

Published coverage links

Open source

Playing a video connects to YouTube. Coverage may be scheduled, live or recorded. If a player is unavailable, use “Open source”.

Mission brief

The flight at a glance.

NASA astronauts Chris Cassidy and Bob Behnken will exit the orbital lab on July 1 to continue replacing batteries that store and distribute power collected from the solar arrays. They will work on the outer portion of the truss structure, or the Starboard-6 truss, disconnecting and removing the old nickel hydrogen batteries. Following that, new lithium-ion batteries will be installed in their place and powered up by mission controllers on the ground.

Open the full mission →

Published flight sequence

Know what comes next.

Planned timings relative to the target. These steps do not indicate live progress.

A flight sequence has not been published for this mission.