Mission coverage
Watch
National Aeronautics and Space Administration
Artemis II SLS Rollout #2

Published coverage links
Playing a video connects to YouTube. Coverage may be scheduled, live or recorded. If a player is unavailable, use “Open source”.
Mission brief
The flight at a glance.
NASA will roll out their second fully stacked Space Launch System (SLS) rocket back to LC-39B after a rollback from the pad to investigate issues with the upper stage helium tanks. The rollout is expected to take up to 12 hours.
Open the full mission →Published flight sequence
Know what comes next.
Planned timings relative to the target. These steps do not indicate live progress.
A flight sequence has not been published for this mission.
