Mission coverage

Watch

Mission coverage

Artemis I SLS Rollout #1

Rollout
Artemis I SLS Rollout #1

Coverage link pending

Published coverage links

A coverage link has not been published yet. Mission status and timing remain available here.

Playing a video connects to YouTube. Coverage may be scheduled, live or recorded. If a player is unavailable, use “Open source”.

Mission brief

The flight at a glance.

NASA will roll out their first fully stacked Space Launch System (SLS) rocket to LC-39B, where it will complete a wet dress rehearsal (WDR) which involves loading the vehicle with propellants and taking the vehicle through the countdown to ignition where the countdown is halted. After the WDR, NASA will roll the vehicle back to the Vehicle Assembly Building to complete final checks prior to rolling out for launch later this year. The rollout is expected to take around 11 hours, and will utilise an upgraded crawler transporter - the same system its predecessors (Space Shuttle, Ares, Saturn, etc.) used.

Open the full mission →

Published flight sequence

Know what comes next.

Planned timings relative to the target. These steps do not indicate live progress.

A flight sequence has not been published for this mission.