Recorded mission
Watch
SpaceX
Falcon 9 Block 5 | Nova-C IM-2 & Others

Recorded mission coverage
Playing a video connects to YouTube. Coverage may be scheduled, live or recorded. If a player is unavailable, use “Open source”.
Mission brief
The flight at a glance.
This is the second mission of Nova-C lunar lander developed and built by Intuitive Machines. This time it carries a NASA payload called PRIME-1 (Polar Resources Ice Mining Experiment-1), which is to be the first demonstration of in-situ resource utilization on the Moon. PRIME-1 consists of two instruments: TRIDENT drill and Msolo mass spectrometer. Also on board are: * Lunar Trailblazer, a small (class D) lunar orbiter, part of NASA's SIMPLEx program, that will detect and map water on the lunar surface to determine how its form, abundance, and location relate to geology. Its mission is to aid in the understanding of lunar water and the Moon's water cycle. * Odin, a spacecraft for AstroForge, a company that plans to mine asteroid resources. Odin intends to head into deep space to observe near-Earth asteroid 2022 OB5 in preparation for their first retrieval mission. Odin will fly by the asteroid at a distance of about 1 kilometer, arriving 11 months after launch. * CHIMERA GEO 1, a transfer spacecraft by Epic Aerospace to a geostationary orbit, with the aim of covering an orbital position. For this launch, CHIMERA-GEO is carrying an unidentified 16U cubesat manifested by Exolaunch.
Open the full mission →Published flight sequence
Know what comes next.
Planned timings relative to the target. These steps do not indicate live progress.
- T−00:38:00
GO for Prop Load
- T−00:35:00
Prop Load
- T−00:35:00
Stage 1 LOX Load
- T−00:16:00
Stage 2 LOX Load
- T−00:07:00
Engine Chill
- T−00:01:00
Startup
See all 26 published steps ↓
- T−00:01:00
Tank Press
- T−00:00:45
GO for Launch
- T−00:00:03
Ignition
- T+00:00:00
Liftoff
- T+00:01:18
Max-Q
- T+00:02:30
MECO
- T+00:02:34
Stage 2 Separation
- T+00:02:42
SES-1
- T+00:03:27
Fairing Separation
- T+00:06:15
Entry Burn Startup
- T+00:06:41
Entry Burn Shutdown
- T+00:07:55
SECO-1
- T+00:08:01
Stage 1 Landing Burn
- T+00:08:31
Stage 1 Landing
- T+00:36:25
SES-2
- T+00:37:26
SECO-2
- T+00:43:38
Payload Separation
- T+00:47:28
Payload Separation
- T+00:47:48
Payload Separation
- T+00:48:08
Payload Separation
