Recorded mission
Watch
SpaceX
Falcon 9 Block 5 | USSF-62

Recorded mission coverage
Playing a video connects to YouTube. Coverage may be scheduled, live or recorded. If a player is unavailable, use “Open source”.
Mission brief
The flight at a glance.
First Weather System Follow-on (WSF) satellite. WSF-M (Weather System Follow-on - Microwave) is the next-generation operational environmental satellite system for the Department of Defense (DoD), to replace the microwave wavelength weather forecasting capabilities of the DMSP satellites. Ball Aerospace has been selected in late November 2017 to be the prime contractor for 2 Low Earth Orbit (LEO) weather satellites with a passive microwave imaging radiometer instrument and hosted Government furnished energetic charged particle (ECP) sensor space weather payload developed by the Air Force Research Laboratory. The radiometer leverages the Ball-built Global Precipitation Measurement (GPM) Microwave Imager (GMI) instrument. This mission will improve weather forecasting over maritime regions by taking global measurements of the atmosphere and ocean surface.
Open the full mission →Published flight sequence
Know what comes next.
Planned timings relative to the target. These steps do not indicate live progress.
- T−00:38:00
GO for Prop Load
- T−00:35:00
Prop Load
- T−00:35:00
Stage 1 LOX Load
- T−00:16:00
Stage 2 LOX Load
- T−00:07:00
Engine Chill
- T−00:01:00
Tank Press
See all 25 published steps ↓
- T−00:01:00
Startup
- T−00:00:45
GO for Launch
- T−00:00:03
Ignition
- T+00:00:00
Liftoff
- T+00:01:12
Max-Q
- T+00:02:19
MECO
- T+00:02:23
Stage 2 Separation
- T+00:02:30
SES-1
- T+00:02:36
Booster Boostback Burn Startup
- T+00:03:01
Fairing Separation
- T+00:03:30
Booster Boostback Burn Shutdown
- T+00:06:07
Entry Burn Startup
- T+00:06:25
Entry Burn Shutdown
- T+00:07:24
Stage 1 Landing Burn
- T+00:07:52
Stage 1 Landing
- T+00:08:27
SECO-1
- T+00:49:51
SES-2
- T+00:49:56
SECO-2
- T+00:54:57
Payload Separation
